BEST ACCESS SYSTEMS 45HM IDH Max 1300 Especificaciones Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 133
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
AU FORM C-5A (March 2002)
3.
ATTACHMENT B TO THE CONSTRUCTION CONTRACT
ATTACHMENT B: HEALTH AND SAFETY
Auburn University Safety Specification Construction
Contracts Single Prime Contract (October 2010) 12
4. #ATTACHMENT C TO THE CONSTRUCTION CONTRACT
AU Form C-5B (December 2011) 1
5. APPENDIX A TO ATTACHMENT B
Project Site Safety Plans (March 2010) 3
6. APPENDIX B TO ATTACHMENT B
Activity Hazard Analysis (March 2010) 3
7. PERFORMANCE BOND
ABC Form C-6 (April 2011) 3
8. PAYMENT BOND
ABC Form C-7 (August 2001) 2
9. GENERAL CONDITIONS OF THE CONTRACT
ABC Form C-8 (Rev. 3/9/2007) 53
10. MANDATORY SUPPLEMENT TO THE GENERAL
CONDITIONS OF THE CONTRACT
ABC Form C-8S (August 2009) 2
11. SUPPLEMENTAL GENERAL CONDITIONS
AU Form C-8 SGC (Rev. 1/7/2012) 7
12. RELEASE OF LIEN FORM
(Rev. 7/12/2007) 1
13. FORM OF ADVERTISEMENT FOR COMPLETION
ABC Form C-14 (Rev. 7/12/07) 1
B. Project Specific Documents
1. SPECIAL CONDITIONS* 1
2. TECHNICAL SPECIFICATIONS on drawings
3. HARDWARE SCHEDULE* 5
4. HARDWARE CUT SHEETS* 76
5. EQUIPMENT CUT SHEETS* 31
6. 13010 ASBESTOS REMOVAL* 15
# Additional Conditions required by the New Immigration Law (Act 2011-535)
* Revised or added per Addendum No. 1
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 132 133

Comentarios a estos manuales

Sin comentarios